Date | Serial | Resistance to Ground | Current (Programmed; mA) | JTAG OK? | Notes | Quality Control | Location | Tape under cupper strap + switches checked | |||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
L1 | L2 | L3 | L4 | L5 | +7V | -7V | +10V | -10V | |||||||
11 July 2007 | 100 | 100k | 45k | 95k | 1.35M | 190 | 110 | 7 | 7 | Y | For Chicago | SQUID_ctrl_board_100.pdf | McGill (???) | Tape replaced, switches good | |
12 July 2007 | 101 | 100k | 5k | 100k | 244k | 2M | 170 | 100 | 7 | 7 | Y | SQUID_ctrl_board_101.pdf | Minnesota (16/01/2013) | Tape okay, switches good (2010/06/17) | |
12 July 2007 | 102 | 45k | 100k | 5k | 85k | 1M | 170 | 100 | 7 | 7 | Y | Short if screw on U18 is tightened too far | McGill (storage room) | Tape replaced, switches good (2010/06/17) | |
12 July 2007 | 103 | 170k | 45k | 100k | 50k | 80k | 190 | 110 | 7 | 7 | Y | SQUID_ctrl_board_103.pdf | McGill (21/01/2013) | Tape okay, switches good (2010/06/18) | |
12 July 2007 | 104 | 100k | 25k | 100k | 115k | 2M | 190 | 110 | 7 | 7 | Y | SQUID_ctrl_board_104.pdf | Berkeley (2008/07/28) | ||
12 July 2007 | 105 | 180k | 35k | 100k | 230k | 1.9M | 170 | 110 | 7 | 7 | Y | SQUID_ctrl_board_105.pdf | Berkeley (2008/07/28) | ||
16 July 2007 | 106 | 5.9k | 200k | 4.9k | 100k | 1M | 180 | 110 | 7 | 7 | Y | SQUID_ctrl_board_106.pdf | Berkeley (2008/07/28) | ||
16 July 2007 | 107 | 6k | 1.5M | 5k | 60k | 1.08M | 190 | 110 | 7 | 7 | Y | SQUID_ctrl_board_107.pdf | Berkeley (2008/07/28) | ||
16 July 2007 | 108 | 6k | 200k | 5k | 100k | 1.25M | 180 | 110 | 7 | 7 | Y | SQUID_ctrl_board_108.pdf | Berkeley (2008/07/28) | ||
16 July 2007 | 109 | 5.9k | 200k | 5k | 1M | 1M | 180 | 110 | 7 | 7 | Y | SQUID_ctrl_board_109.pdf | Berkeley (2008/07/28) | ||
17 July 2007 | 110 | 6k | 200k | 5k | 100k | 1.2M | 180 | 110 | 7 | 7 | Y | SQUID_ctrl_board_110.pdf | Berkeley (2008/07/28) | ||
17 July 2007 | 111 | 5.9k | 200k | 5k | 1M | 1M | 180 | 110 | 7 | 7 | Y | Sent to Masashi | SQUID_ctrl_board_111.pdf | Japan | Tape replaced Switches done. |
17 July 2007 | 112 | 5.9k | 200k | 40k | 75k | 1.1M | 170 | 110 | 7 | 7 | Y | For Berkeley Lab | SQUID_ctrl_board_112.pdf | Berkeley | Tape replaced switches done |
18 July 2007 | 113 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_113.pdf | Japan | switches good |
18 July 2007 | 114 | 5.8k | 200k | 30k | 60k | 1.2M | 170 | 110 | 7 | 7 | Y | Short if screw on U18 is tightened too far | SQUID_ctrl_board_114.pdf | Minnesota (16/01/2013) | Tape okay, switches good (2010/06/18) |
18 July 2007 | 115 | 6k | 200k | 4.8k | 100k | 1.2M | 170 | 110 | 7 | 7 | Y | Nils Halverson | SQUID_ctrl_board_115.pdf | UC Boulder | Tape replaced, switches good |
18 July 2007 | 116 | 5.9k | 200k | 5k | 100k | 1M | 180 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_116.pdf | Japan | switches good |
19 July 2007 | 117 | 5.9k | 220k | 5k | 100k | 1.3M | 180 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_117.pdf | Japan | switches good |
19 July 2007 | 118 | 5.9k | 250k | 5k | 100k | 1.3M | 180 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_118.pdf | Japan | switches good |
19 July 2007 | 119 | 5.9k | 200k | 5k | 100k | 1.3M | 180 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_119.pdf | Japan | switches good |
19 July 2007 | 120 | 5.9k | 200k | 5k | 100k | 1.3M | 180 | 110 | 7 | 7 | Y | For SPT Pol, @ Berkeley | SQUID_ctrl_board_120.pdf | McGill | |
19 July 2007 | 121 | 5.9k | 200k | 5k | 86k | 1.3M | 170 | 110 | 7 | 7 | Y | For SPT Pol, @ Chicago | SQUID_ctrl_board_121.pdf | McGill | Tape replaced, switches good (2010/06/18) |
19 July 2007 | 122 | 5.9k | 200k | 5k | 100k | 1.3M | 180 | 110 | 7 | 7 | Y | For SPT Pol, @ Chicago | SQUID_ctrl_board_122.pdf | McGill | Tape okay, switches good (2010/06/18) |
19 July 2007 | 123 | 5.9k | 200k | 5k | 100k | 1.3M | 180 | 110 | 7 | 7 | Y | For SPT Pol, @ Chicago | SQUID_ctrl_board_123.pdf | McGill | Tape okay, switches good (2010/06/18) |
19 July 2007 | 124 | 5.9k | 200k | 5k | 100k | 1.3M | 160 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_124.pdf | Japan | switches good |
19 July 2007 | 125 | 5.9k | 200k | 5k | 100k | 1.3M | 180 | 110 | 7 | 7 | Y | SQUID_ctrl_board_125.pdf Bad carrier for channel 8 | McGill (21/01/2013) | Tape okay, switches good (2010/06/18) | |
19 July 2007 | 126 | 5.9k | 200k | 5k | 100k | 1.3M | 160 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_126.pdf | Japan | switches good |
19 July 2007 | 127 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_127.pdf | Japan | switches good |
19 July 2007 | 128 | 5.9k | 200k | 5k | 1.5M | 1.5M | 170 | 110 | 7 | 7 | Y | Adam mod(2010/12/10): changed Rx36 and Rx43 to 2.49K 1% resistors; Short if screw on U18 is tightened too far | SQUID_ctrl_board_128.pdf | Minnesota (16/01/2013) | Tape replaced, switches good (2010/06/18) |
30 July 2007 | 129 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | For ASTE | SQUID_ctrl_board_129.pdf | Japan | switches good |
30 July 2007 | 130 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Adam mod(2010/12/10): changed Rx36 and Rx43 to 2.49K 1% resistors | SQUID_ctrl_board_130.pdf | Minnesota (16/01/2013) | Tape okay, switches good (2010/06/18) |
30 July 2007 | 131 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | SqCh4 has flux loop problem | SQUID_ctrl_board_131.pdf | McGill (22/01/2013) | Tape okay, switches good (2010/06/18) - FPGA Not responding (Palestine 2011/05/21) |
30 July 2007 | 132 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Adam mod(2010/12/10): changed Rx36 and Rx43 to 2.49K 1% resistors |
SQUID_ctrl_board_132.pdf | Minnesota (16/01/2013) | Tape okay, switches good (2010/06/18) |
30 July 2007 | 133 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | SQUID_ctrl_board_133.pdf | McGill (PTC dewar) | ||
30 July 2007 | 134 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Adam mod(2010/12/10): changed Rx36 and Rx43 to 2.49K 1% resistors; Short if screw on U18 is tightened too far | SQUID_ctrl_board_134.pdf | Minnesota (16/01/2013) | Tape replaced, switches good (2010/06/18) |
30 July 2007 | 135 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Adam mod(2010/12/10): changed Rx36 and Rx43 to 2.49K 1% resistors | Minnesota (16/01/2013) | Tape replaced, switches good (2010/06/18) | |
30 July 2007 | 136 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | SQUID_ctrl_board_136.pdf | McGill (lab) | ||
30 July 2007 | 137 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | SQUID_ctrl_board_137.pdf | McGill (PTC dewar) | ||
30 July 2007 | 138 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Adam mod(2010/12/10): changed Rx36 and Rx43 to 2.49K 1% resistors; Short if screw on U18 is tightened too far Asad (2011/12/12) modifications to bypass open wire in EBEX wiring harness on Ch.8:
|
Short on U19 | Minnesota (16/01/2013) | Tape okay, switches good (2010/06/18) |
30 July 2007 | 139 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | SQUID_ctrl_board_139.pdf | McGill (PTC dewar) | ||
30 July 2007 | 140 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 17 | 17 | Y | Note extra draw on 10V rails (something funny) Franky changed U14 on 2011/10/25 since it drew too much current the the board was not responding |
SQUID_ctrl_board_140.pdf | McGill (22/01/2013) | |
30 July 2007 | 141 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Minnesota mod (07/07/08): changed Rx36 and Rx43 to 2.49K 1% resistors Franky (09/11/2012) : R831 from 8K to 2.55K |
SQUID_ctrl_board_141.pdf | Minnesota (16/01/2013) | Tape replaced, switches good (2008/11/05) |
30 July 2007 | 142 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Minnesota mod (07/07/08): changed Rx36 and Rx43 to 2.49K 1% resistors; Flaky connection, rebooted in bad state and heated the SQUIDs | SQUID_ctrl_board_142.pdf | Graeme, Vancouver (EBEX board) | Tape replaced, switches good (2008/11/05) |
30 July 2007 | 143 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Minnesota mod (07/07/08): changed Rx36 and Rx43 to 2.49K 1% resistors | SQUID_ctrl_board_143.pdf | ??? | Tape replaced, switches good (2009/04/02) |
30 July 2007 | 144 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Short if screw on U18 is tightened too far. Minnesota mod(07/07/08): changed Rx36 and Rx43 to 2.49K 1% resistors | SQUID_ctrl_board_144.pdf | Minnesota (16/01/2013) | Tape replaced, switches good (2008/11/05) |
30 July 2007 | 145 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Minnesota mod(07/07/08): changed Rx36 and Rx43 to 2.49K 1% resistors | SQUID_ctrl_board_145.pdf | Minnesota (16/01/2013) | Tape replaced, switches good (2009/04/02) |
30 July 2007 | 146 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Minnesota mod(07/07/08): changed Rx36 and Rx43 to 2.49K 1% resistors Does not work properly |
SQUID_ctrl_board_146.pdf | McGill (22/01/2013) | Tape replaced, switches good (2008/08/19) |
30 July 2007 | 147 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Minnesota mod: changed Rx36 and Rx43 to 2.49K 1% resistors | SQUID_ctrl_board_147.pdf | Minnesota (16/01/2013) | Tape replaced, switches good (2008/10/31) |
30 July 2007 | 148 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Franky (09/11/2012) : R122, R222 & R322 from 38.3K to 20K | SQUID_ctrl_board_148.pdf | Minnesota (16/01/2013) | Tape replaced, switches good (2009/04/02) |
30 July 2007 | 149 | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Adam mod(2010/12/10): changed Rx36 and Rx43 to 2.49K 1% resistors | SQUID_ctrl_board_149.pdf | Minnesota (16/01/2013) | Tape okay, switches good (2010/06/18) |
5 July 2010 | Case 1 (CWRU) | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Rev 4 board for SPTPol. Expected DAC Offset Phi_bias slope changed from rev3 | SQUID_ctrl_board_Case1.pdf | Case | Tape N/A for Rev 4. Switches good |
5 July 2010 | Case 2 (CWRU) | 5.9k | 200k | 5k | 100k | 1.3M | 170 | 110 | 7 | 7 | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_Case2.pdf | Case | Tape N/A for Rev 4. Switches good |
13 October 2010 | 200 | - | - | - | - | - | - | - | - | - | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_200.pdf | Berkeley | |
13 October 2010 | 201 | - | - | - | - | - | - | - | - | - | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_201.pdf | Berkeley | |
13 October 2010 | 202 | - | - | - | - | - | - | - | - | - | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_202.pdf | Berkeley | |
13 October 2010 | 203 | - | - | - | - | - | - | - | - | - | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_203.pdf | Berkeley | |
13 October 2010 | 204 | - | - | - | - | - | - | - | - | - | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_204.pdf | Berkeley | |
13 October 2010 | 205 | - | - | - | - | - | - | - | - | - | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_205.pdf | Berkeley | |
13 October 2010 | 206 | - | - | - | - | - | 188 | 98 | 6 | 6 | Y | Rev 4 board for SPTPol. | SQUID_ctrl_board_206.pdf | Berkeley | |
30 November 2010 | 207 | - | - | - | - | - | 187 | 98 | 7 | 7 | Y | Rev 4 board for Polarbear Currents for 207-226 measured with Xilinx cable attached, seems to draw ~15mA more on +7V rail. | SQUID_ctrl_board_207.pdf | Berkeley (1/18/11) | |
30 November 2010 | 208 | - | - | - | - | - | 186 | 98 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_208.pdf | Berkeley (1/18/11) | |
30 November 2010 | 209 | - | - | - | - | - | 184 | 97 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_209.pdf | Berkeley (1/18/11) | |
30 November 2010 | 210 | - | - | - | - | - | 185 | 97 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_210.pdf | Berkeley (1/18/11) | |
30 November 2010 | 211 | - | - | - | - | - | 198 | 139 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_211.pdf | Case | DAC offset vs. Fbias failed for Ch3 |
30 November 2010 | 212 | - | - | - | - | - | 185 | 97 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_212.pdf | Berkeley (1/18/11) | |
30 November 2010 | 213 | - | - | - | - | - | 186 | 98 | 7 | 7 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_213.pdf | Berkeley (1/18/11) | |
30 November 2010 | 214 | - | - | - | - | - | 187 | 98 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_214.pdf | Berkeley (1/18/11) | |
30 November 2010 | 215 | - | - | - | - | - | 182 | 97 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_215.pdf | Berkeley (1/18/11) | |
30 November 2010 | 216 | - | - | - | - | - | 185 | 97 | 7 | 7 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_216.pdf | Berkeley (1/18/11) | |
30 November 2010 | 217 | - | - | - | - | - | 185 | 98 | 7 | 7 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_217.pdf | Berkeley (1/18/11) | |
30 November 2010 | 218 | - | - | - | - | - | 187 | 98 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_218.pdf | Berkeley (1/18/11) | |
30 November 2010 | 219 | - | - | - | - | - | 202 | 138 | 7 | 7 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_219.pdf | Berkeley (1/18/11) | |
30 November 2010 | 220 | - | - | - | - | - | 186 | 98 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_220.pdf | Berkeley (1/18/11) | |
30 November 2010 | 221 | - | - | - | - | - | 185 | 98 | 7 | 7 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_221.pdf | Berkeley (1/18/11) | |
30 November 2010 | 222 | - | - | - | - | - | 184 | 98 | 7 | 6 | Y | Rev 4 board for Polarbear | SQUID_ctrl_board_222.pdf | Berkeley (1/18/11) | |
30 November 2010 | 223 | - | - | - | - | - | 185 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_223.pdf | Case | Colorado |
30 November 2010 | 224 | - | - | - | - | - | 182 | 97 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_224.pdf | Case | Channel 7 non-responsive to tests (2001/04/10) |
30 November 2010 | 225 | - | - | - | - | - | 184 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_225.pdf | Case | Colorado |
30 November 2010 | 226 | - | - | - | - | - | 187 | 99 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_226.pdf | Chicago (7/18/11) | |
7 December 2010 | 227 | - | - | - | - | - | 168 | 97 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_227.pdf | Chicago (7/18/11) | |
7 December 2010 | 228 | - | - | - | - | - | 168 | 97 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_228.pdf | Chicago (7/18/11) | |
7 December 2010 | 229 | - | - | - | - | - | 171 | 97 | 6 | 6 | Y | Rev 4 board | SQUID_ctrl_board_229.pdf | Chicago (7/18/11) | |
7 December 2010 | 230 | - | - | - | - | - | 179 | 98 | 6 | 6 | Y | Rev 4 board | SQUID_ctrl_board_230.pdf | Chicago (7/18/11) | |
7 December 2010 | 231 | - | - | - | - | - | 170 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_231.pdf | Chicago (7/18/11) | |
7 December 2010 | 232 | - | - | - | - | - | 170 | 99 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_232.pdf | Case | Ch4 Vout vs. Feedback is wrong (2011/4/10) |
7 December 2010 | 233 | - | - | - | - | - | 168 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_233.pdf | Chicago (7/18/11) | |
7 December 2010 | 234 | - | - | - | - | - | 167 | 97 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_234.pdf | Chicago (7/18/11) | |
7 December 2010 | 235 | - | - | - | - | - | 170 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_235.pdf | Chicago (7/18/11) | |
7 December 2010 | 236 | - | - | - | - | - | 169 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_236.pdf | Chicago (7/18/11) | |
14 January 2011 | 237 | - | - | - | - | - | 170 | 99 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_237.pdf | Chicago (7/18/11) | |
14 January 2011 | 238 | - | - | - | - | - | 185 | 139 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_238.pdf | Chicago (7/18/11) | |
14 January 2011 | 239 | - | - | - | - | - | 170 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_239.pdf | Chicago (7/18/11) | |
14 January 2011 | 240 | - | - | - | - | - | 170 | 97 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_240.pdf | Chicago (7/18/11) | |
14 January 2011 | 241 | - | - | - | - | - | 168 | 97 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_241.pdf | Chicago (7/18/11) | |
14 January 2011 | 242 | - | - | - | - | - | 168 | 97 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_242.pdf | Case | FPGA not responding (2011/4/10) |
14 January 2011 | 243 | - | - | - | - | - | 172 | 99 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_243.pdf | Chicago (7/18/11) | |
14 January 2011 | 244 | - | - | - | - | - | 172 | 98 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_244.pdf | Berkeley (8/9/11) | |
14 January 2011 | 245 | - | - | - | - | - | 172 | 98 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_245.pdf | Berkeley (8/9/11) | |
14 January 2011 | 246 | - | - | - | - | - | 169 | 98 | 7 | 6 | Y | Rev 4 board | SQUID_ctrl_board_246.pdf | Berkeley (8/9/11) | |
14 January 2011 | 247 | - | - | - | - | - | 167 | 98 | 7 | 7 | Y | Rev 4 board | SQUID_ctrl_board_247.pdf | Berkeley (8/9/11) | |
14 January 2011 | 248 | - | - | - | - | - | N/A | N/A | N/A | N/A | N | Rev 4 board. Imact could not connect, could not flash PROM. | SQUID_ctrl_board_248.pdf | Case |
|
8 April 2011 | 249 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_249.pdf | Berkeley (8/9/11) | ||||||
8 April 2011 | 250 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_250.pdf | Berkeley (8/9/11) | ||||||
8 April 2011 | 251 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_251.pdf | Berkeley (8/9/11) | ||||||
8 April 2011 | 252 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_252.pdf | Berkeley (8/9/11) | ||||||
8 April 2011 | 253 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_253.pdf | Berkeley (8/9/11) | ||||||
8 April 2011 | 254 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_254.pdf | Berkeley (8/9/11) | ||||||
8 April 2011 | 255 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_255.pdf | Berkeley (8/9/11) | ||||||
8 April 2011 | 256 | - | - | - | - | - | Rev 4 board | SQUID_ctrl_board_256.pdf | Berkeley (8/9/11) | ||||||
30 August 2013 | 002 | LISA Prototype Board??? | McGill (storage Room) |